top of page

Installation PROCESS

Want to know more about SaniFresh™? We’ve included a quick overview for a behind the scenes guide about what you can expect during an installation

01

QUALITY CONTROL

Your designated specialist will examine
the unit and match the cylinder to
your compactor’s hydraulic fittings.
[for self contained compactors]

02

NOZZLE INSTALLATION

Next, the nozzle is mounted on the container’s exterior, designed for placement based on compactor type, chute type, and trash room layout, so that it applies a direct hit to the garbage within.

03

ARCHITECTURAL FITTING

The unit’s spray bracket is
attached via sheet metal screws
and architecturally sound
positioning.

04

TUBING APPLICATION

Liquid line tubing is then formed and
applied via quick disconnect fittings for
fluid transfer lines that will transport the
liquid in its vaporized form.

05

POWER CONNECTION

A reliable power source is formed
via connecting the system to an
electrical port.

06

PUMP PREPARATION

The unit’s spray bracket is
attached via sheet metal screws
and architecturally sound
positioning.

07

PRODUCT PROTECTION

For added durability, a water
repellent drum cover installation
keeps the unit safe for prolonged
periods of time.

bottom of page